Investigation and Remediation of the UNC Airport Road Waste Disposal Site
Use the following links and resources to learn more about the investigation and remediation conducted at the site.
Annual Reports
- 2015 Annual Report
- 2014 Annual Report
- 2013 Annual Report
- 2012 Annual Report
- 2011 Annual Report
- 2010 Annual Report
- 2009 Annual Report
July 2008 Updates
- Preconstruction Report: Source Remedy
- Appendix D
- Table 2-1: Summary of Soil Analytical Results
- Lecture Bottle Technical Evaluation
- Health and Safety Plan – Addendum 1: Lecture Bottle Sized Cylinder Evaluation and Handling Procedures
- Health and Safety Plan – Addendum 2: Potential Exposures to Radiological Wastes
Groundwater Treatment System Construction Report
- UNC Airport Road Final CC Report
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E-1
- Appendix E-2
- Appendix F
- Appendix G-1
- Appendix G-2
- Appendix G-3
- Appendix H
- Appendix I-1
- Appendix I-2
Remedial Action Plan
(April 2005)
- 2005 Remedial Action Plan
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E
- Appendix F1
- Appendix F2
- Figures
- Tables
Public Briefing: PowerPoint presentation (April 28, 2005)
Remedial Investigation Report
(October 2004)
For more information, please contact:
Mary Beth Koza, Director
Department of Environment, Health & Safety
University of North Carolina
1120 Estes Drive Extension, CB #1650
Chapel Hill, NC 27599-1650
919-962-5712; 919-962-0227 (fax)
Email contact