Please be advised that all the abatement with the exception of the 1st floor and lower level has been completed, and the final inspection is scheduled for Tuesday.

We are currently submitting for a demo permit for the restaurant and lower level vacant space to conduct the full abatement/demo of those areas. Once permits are approved, additional information will be communicated.

The 1st floor and lower level lobbies are being left as is for now, and these areas will be addressed once design plans are complete.

The second floor of the Franklin building is being left as is at this time.

AT&T fiber install of the Franklin building is being looked into. At this time AT&T has run the cables from the street to the main electric room. An investigation is underway to determine the best way to run conduit from that area into the rest of the building.